Step by Step
Four Steps. No Surprises.

Step 01
Prep
Good paint jobs are won before the first coat. We move and cover furniture, protect floors and fixtures, then wash, scrape, patch, caulk and sand every surface so the finish has something solid to bond to.
Furniture moving and full floor protection
Surface cleaning, scraping and sanding
Hole, crack and trim repair
Typical timing: Usually the first day
Step 02
Prime
Primer seals repairs, blocks stains and gives the topcoat an even base. We choose the right primer for each surface, from bare wood and new drywall to glossy trim and water-stained ceilings.
Spot or full priming as needed
Stain-blocking primer on problem areas
Bonding primer on cabinets and glossy trim
Typical timing: A few hours to a day


Step 03
Paint
We apply two coats of premium paint with clean cut lines, even roller texture and no drips. The crew cleans up at the end of every day so your home stays livable while we work.
Two coats of premium paint
Sharp cut lines at ceilings and trim
Daily cleanup and a tidy workspace
Typical timing: Most of the project
Step 04
Final Walkthrough
Before we call it done, we walk every room with you and mark anything that isn’t perfect. We fix touch-ups on the spot, put your space back together and leave it cleaner than we found it.
Room-by-room walkthrough together
Same-day touch-ups
Furniture back in place and final cleanup
Typical timing: The last day

Before We Start
From First Call to Start Date.
01
Free Estimate Visit
We walk the space with you, measure, look at surfaces and talk through what you want.
02
Written Quote
You get a clear, itemized quote within two business days. No hidden fees or surprise add-ons.
03
Color Consultation
Not sure about colors? We bring samples and help you choose shades and sheens that fit your space.
04
Scheduling
We book a start date that works for you and confirm the crew, timeline and prep the week before.
How to Prepare
A Little Prep Goes a Long Way.
We handle the heavy lifting, from moving furniture to covering floors. These few things on your end help day one start smoothly.
Your Prep Checklist
01
Clear small items, decor and wall hangings from the work area
02
Point out anything fragile or valuable we should know about
03
Keep pets and kids in another part of the home during work
04
Leave a parking spot near the entrance for our crew
05
Give us access to water and power (exterior jobs)
06
Let neighbors know if we’ll be using ladders near property lines
Our Promise
Work You Can Count On.
5-Year Warranty
If paint peels or blisters because of our workmanship, we come back and fix it.
Licensed & Insured
Full general liability and workers’ compensation coverage on every job.
Daily Cleanup
Your space is swept, tidied and livable at the end of every workday.
One Point of Contact
A dedicated project lead answers your questions from estimate to walkthrough.
Questions
Common Questions.
Have a question we didn’t cover? Call (919) 555-0142 and we’ll talk it through.
Q.
Do you require a deposit?
Most residential projects need a small deposit to reserve your start date, with the balance due after the final walkthrough.
Q.
What happens if it rains?
Interior work goes ahead as planned. For exteriors we watch the forecast and reschedule around rain, then let you know the new dates right away.
Q.
Which sheen should I choose?
Flat or matte for ceilings, eggshell for most walls, satin for kitchens and baths, and semi-gloss for trim and doors. We’ll recommend what fits each room.
Q.
Do I need to be home while you work?
No. Many clients leave us a key or code. We just need access and a way to reach you during the day.
Q.
How long does paint take to cure?
Paint is dry to the touch in hours, but it fully cures over two to four weeks. We’ll tell you how to care for it in the meantime.

